The Early Years (2022)

 

  • Sustainable Small House on 10/11/22
    Initial photo of Sustainable Small House front 10/11/22
  • Sustainable Small House on 10/28/22
    Initial backside view of Sustainable Small House 10/28/22
  • Basement
    Basement house after installation of water cisterns 10/28/22
  • Walking up to the Sustainable Small House
    Far view of Sustainable Small House 11/05/22
  • Alternative View of the Sustainable Small House
    Zoomed in view of SSH from afar 11/05/22
  • Alternative view of the Sustainable Small House
    Front-facing view of Sustainable Small House 11/05/22

Gaining Traction (2023)

 

  • May 2nd, 2023
    Roofing replacement in progress 05/02/23
  • May 2nd, 2023
    Wide view of roofing replacement 05/02/23
  • 2023
    Digging channel for drainage tube 05/02/23
  • May 2nd, 2023
    Excavation for future pond 05/02/23
  • May 2nd, 2023
    Far view of SSH and pond excavation 05/02/23
  • May 2nd, 2023
    Covered drainage tube 05/02/23
  • May 2nd, 2023
    Gravel is poured to form an access driveway 05/02/23
  • May 2nd, 2023
    Gravel driveway ends right aside SSH's right side 05/02/23
  • December 11th, 2023
    December 11th, 2023
  • December 11th, 2023
    Further excavation for pond 12/11/23
  • December 11th, 2023
    Tarps are laid to form a watertight bottom for the pond 12/11/23
  • December 11th, 2023
    Interior for Sustainable Small House 12/11/23
  • December 27th, 2023
    Pond accumulating water deposited by snow 12/27/23

Challenges and Triumphs (May 2024 - August 2024)

 

  • May 22nd, 2024
    Side pond filled up by accumulated water 05/22/24
  • May 22nd, 2024
    Shaping landscape to make room for future wall 05/22/24
  • May 31st, 2024
    Wall frames for indoor bathroom 05/31/24
  • May 31st, 2024
    Back view of SSH 05/31/24
  • July 6th, 2024
    SSH breaker room 07/06/24
  • July 6th, 2024
    Far view of house 07/06/24
  • July 6th, 2024
    View of house across pond 07/05
  • July 10th, 2024
    House interior after drywall installation (1/2) 07/10/24
  • July 10th, 2024
    House interior after drywall installation (2/2) 07/10/24
  • August 10th, 2024
    Initial layout for basement side wall 08/10/24
  • August 11th, 2024
    Flattening ground around back side of house 08/11/24
  • August 11th, 2024
    Backfilling basement side wall 08/11/24
  • August 11th, 2024
    Front view of wall 08/11/24
  • August 11th, 2024
    View of basement access door after laying down right wall 08/11/24
  • August 11th, 2024
    View of terrain left to basement door, where another wall is to be laid 08/11/24
  • August 11th, 2024
    Top view of wall after backfilling 08/11/24
  • August 11th, 2024
    Back view of SSH with parked skidloader 08/11/24
  • August 13th, 2024
    Basement door with left wall laid down 08/13/24
  • August 13th, 2024
    View of leftside wall with drainage tube 08/13/24
  • August 13th, 2024
    Laying down bricks for overhang wall 08/13/24
  • August 13th, 2024
    Installation of ventilation unit (1/2) 08/13/24
  • August 13th, 2024
    Installation of ventilation unit (2/2) 08/13/24
  • August 13th, 2024
    Construction progress on overhang wall 08/13/24
  • August 13th, 2024
    Finished wall for overhang 08/13/24
  • August 13th, 2024
    Team responsible for overhang wall 08/13/24
  • August 13th, 2024
    Wide view of wall from inside overhang 08/13/24
  • August 14th, 2024
    Overhang after rain 08/14/24
  • August 14th, 2024
    Plant growth near front of house (1/2) 08/14/24
  • August 14th, 2024
    Plant growth near front of house (2/2) 08/14/24
  • August 14th, 2024
    View of overhang interior atop wall 08/14/24
  • August 15th, 2024
    Uncluttered view of house interior 08/15/24
  • August 15th, 2024
    Bathroom for SSH after drywall installation 08/15/24
  • Painting indoor walls of house August 28, 2024
    Painting house interior 08/28/24

Sustainable Impact (October 2024 - Now)

 

  • Calibrating solar panels October 12, 2024
    Calibrating solar panels 10/12/24
  • Building out supports for front walkway Nov 2, 2024
    Building up structural supports for front patio 11/02/24
  • Installing solar panels on overhang Nov 14, 2024
    Adding solar panels to overhang 11/14/24
  • Underside of overhang with solar panels installed Nov 14, 2024
    Underside of solar panel installation 11/14/24
  • Finished solar panel installation on side overhang Nov 15, 2024
    Front view of SSH and completed overhang 11/15/24
  • Nov 2024
    SSH breaker room 11/18/24
  • Organizing materials stored in basement Nov 23, 2024
    Organizing materials for construction in basement 11/23/24
  • Laying down boards to build front patio Nov 23, 2024
    Laying down boards to build front patio 11/23/24
  • Night view of front patio in-progress Nov 24, 2024
    Nighttime view of front patio 11/24/24
  • Bathroom with adjustable sink Nov 25, 2024
    House bathroom with adjustable sink for accessability 11/25/24
  • Zoomed out view of house bathroom Nov 25, 2024
    Zoomed out view of bathroom, including walk-in shower 11/25/24
  • Side view of house across filled pond Nov 30, 2024
    Side view of sustainable house across pond 11/30/24
  • Draining pond December 2, 2024
    Water being draining out of pond 12/02/24
  • Emptied pond 12/03/24
    Pond next day after being drained and drying out 12/03/24
  • Installing floor heating coils 12/04/24
    Installing floor heating coils 12/04/24
  • Working on basement ceiling 12/08/24
    Ongoing installation of coils in basement ceiling 12/08/24
  • Source image for current front page Dec 22, 2024
    Front view of Sustainable Small House 12/22/24
  • Back view of SSH 12/22/24
    Back view of Sustainable Small House 12/22/24
  • Insulating house floor / basement ceiling 12/23/24
    Applying insulation to basement ceiling 12/23/24
  • Installing basement ceiling panels 12/23/24
    Covering up ceiling insulation with paneling 12/23/24

Legacy and Future Directions:
(Under Construction)

Notable Achievements:
(Under Construction)